Eskom has announced a significant load shedding plan for Gauteng, with a scheduled 9 hour power outage set to impact several areas on 21 August 2024. This planned outage is part of Eskom’s ongoing efforts to manage the electricity supply and prevent the grid from being overwhelmed.
Load Shedding Plan: Details of the 9 Hour Power Outage
The scheduled outage will primarily affect the areas of Rockville, Molapo, and Moroka. According to the latest details from Eskom, the power cut will begin at 08:00 AM and is expected to last until 05:00 PM on 21 August 2024. This extended outage is necessary to perform critical maintenance on the electricity infrastructure and ensure the long-term stability of the power supply in these areas.
For accurate details on the affected areas and additional information, you can visit the official announcement here: Eskom to Implement Nine-Hour Power Outage in Gauteng.
Areas Affected by the Power Outage
The specific areas impacted by the 9-hour power outage on 21 August 2024 include:
- Rockville
- Molapo
- Moroka
Residents and businesses in these areas are advised to prepare for the extended outage by making necessary arrangements. This might include ensuring that backup power sources are available, charging essential devices ahead of time, and planning daily activities around the outage hours.
Why Load Shedding is Necessary
Load shedding is a critical tool used by Eskom to manage the electricity grid during periods of high demand or when there is insufficient supply. By implementing scheduled outages, Eskom can prevent the grid from becoming overloaded, which could lead to more severe and widespread blackouts.
The planned maintenance during this outage is also crucial for addressing any potential issues within the power infrastructure. Regular maintenance helps to reduce the likelihood of unplanned outages and ensures that the electricity supply remains reliable in the long run.
How to Prepare for the Outage
To minimise the impact of the 9 hour power outage on your day, consider taking the following steps:
- Charge Essential Devices: Ensure that all your mobile phones, laptops, and other essential devices are fully charged before the outage begins.
- Plan Meals in Advance: If you rely on electric cooking appliances, prepare meals ahead of time or have alternative cooking methods ready.
- Backup Power Sources: If possible, use a generator, solar power, or other backup power sources to keep critical systems running during the outage.
- Stay Updated: Follow Eskom’s updates through their official channels or news outlets to stay informed about any changes to the outage schedule.
The 9 hour power outage scheduled for 21 August 2024 in Gauteng is part of Eskom’s ongoing efforts to maintain and improve the electricity supply infrastructure. While the extended outage may cause some inconvenience, it is a necessary step to ensure the long-term stability and reliability of the power grid. Residents and businesses in the affected areas are encouraged to prepare accordingly and stay informed through official Eskom updates.


